2002 Isuzu Trooper LS, RWDFACTORY OEM SERVICE PROCEDURE

Generators & Regulators: Overhaul: Generator: Disassembly

  1. Remove terminal insulator and nut (2).
  2. Remove three nuts (1) on the rear cover and a nut on terminal B and insulator, then remove the rear cover (3). See Fig 1 .
  3. Remove two screws that fix the brush holder (5) and rectifier, then remove the brush holder assembly (4). See Fig 2 .
  4. Remove 3 screws on the IC regulator, then the IC regulator assembly (6). See Fig 3 .
  5. Remove 4 screws that fix rectifier (7) and stator lead wires. See Fig 4 .
  6. Secure the pulley directly in the vise between two copper plates, and remove the nut and pulley. See Fig 5 .
  7. Remove 4 nuts (8) that secure the front cover assembly and rear end cover, and an insulator (9). See Fig 6 .
  8. Use the puller to remove the rear end cover.
  9. Rotor assembly. See Fig 7 .
  10. Pull the rotor assembly (10) off the front cover assembly (12) using a bench press (11). See Fig 8 .
Fig 1: Removing Rear Cover
G00351555Courtesy of ISUZU MOTOR CO.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.