2002 Isuzu Rodeo LS, 2.2 DFACTORY OEM SERVICE PROCEDURE

Power Steering Unit: Reassembly

  1. Install mounting rubber and dust cover (If removed).
  2. Install oil line.

    Torque:Β  13 N.m (113 lb in)

  3. Install tie-rod assembly with tab washer.

    Apply grease to ball joint, install tie-rod and tab washer, then tighten to specified torque.

    Torque:Β  83 N.m (61 lb ft)

    After tightening, bend tab washer against width across flat of inner ball joint.

  4. Apply a thin coat of grease to the shaft for smooth installation. Then install bellows.
  5. Install band and clip.
  6. Install tie-rod end and tighten lock nut.

    Torque:Β  98 N.m (72 lb ft)

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.