2002 Isuzu Axiom Base, RWDFACTORY OEM SERVICE PROCEDURE

Getting Started

  1. Before operating the Isuzu PCMCIA card with the Tech 2, the following steps must be performed:
  2. The Isuzu 98 System PCMCIA card (1) inserts into the Tech 2 (4)
  3. Connect the SAE 16/19 adapter (2) to the DLC cable (3).
  4. Connect the DLC cable to the Tech 2 (4).
  5. Make sure the vehicle ignition is off.
  6. Connect the Tech 2 SAE 16/19 adapter to the vehicle DLC.
    Fig 1: Connecting Tech 2 Scan Tool To Vehicle DLC
    G02805047Courtesy of ISUZU MOTOR CO.
  7. The vehicle ignition turns on.
  8. Power up the Tech 2.
  9. Verify the Tech 2 power up display.
Fig 2: Locating Tech 2 Power Up Display
G02805048Courtesy of ISUZU MOTOR CO.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.