2000 Isuzu Rodeo S 2WD V6-3.2LFACTORY OEM SERVICE PROCEDURE

Engine Control Module: Service and Repair

REMOVAL PROCEDURE
1. Disconnect the negative battery cable.
2. Block the wheels.
3. Remove the two screws from the PCM electrical connectors.

Factory service manual diagram



4. Disconnect the PCM electrical connectors.

Factory service manual diagram



5. After removing the clip which fixes the PCM to the bracket, remove PCM.

INSTALLATION PROCEDURE

Factory service manual diagram



1. Install the PCM to bracket and fix with the clip.
2. Connect the PCM electrical connectors.

Factory service manual diagram



3. Install the two screws to PCM electrical connectors.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.