1994 Isuzu Rodeo LS, RWDFACTORY OEM SERVICE PROCEDURE

Power Window Switch Continuity Test (Driver-Side Switch)

  1. Remove switch from door trim panel. Disconnect power window switch harness connector. Using an ohmmeter, check continuity between specified switch terminals with switch in specified position. See DRIVER-SIDE SWITCH TESTINGΒ  .
  2. Continuity is checked between 2-terminal connector and 10-terminal connector. Use illustration for switch terminal identification. SeeFigure and Figure . If continuity is not as specified, replace appropriate switch.
DRIVER-SIDE SWITCH TESTING

Switch Position (1) Check Continuity Between Terminals:
Left Front
DOWN 1 & 6; 2 & 5
OFF 2 & 5; 2 & 6
UP 1 & 5; 2 & 6
Right Front
DOWN 1 & 2; 2 & 1
OFF 2 & 1; 2 & 2
UP 1 & 1; 2 & 2
Left Rear
DOWN 1 & 3; 2 & 4
OFF 2 & 3; 2 & 4
UP 1 & 4; 2 & 3
Right Rear
DOWN 1 & 9; 2 & 10
OFF 2 & 9; 2 & 10
UP 1 & 10; 2 & 9
Lock
OFF (Unlock) 1 & 7
ON (Lock) N/A
(1) First number is 2-terminal connector. Second number is 10-terminal connector. SeeFigure and Figure .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.