1983 Isuzu Impulse AutomaticFACTORY OEM SERVICE PROCEDURE

Pull-In Coil Test

  1. Connect jumper between positive post of 12-volt battery and "S" terminal. Connect a second jumper to negative battery terminal and touch "M" (MT) terminal (and between terminal "S" and switch body). See Fig 1.
    Fig 1: Connections for Conducting Solenoid Pull-In Test Remove solenoid-to-starter lead before testing.
    G29414
  2. If pinion moves outward (or plunger is pulled-in), pull-in coil is good. If not, replace magnetic switch.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.