2024 Infiniti QX55 EssentialFACTORY OEM SERVICE PROCEDURE

Exploded View

Fig 1: Valve Timing Control Cover With Torque Specifications
GNSDB128257Courtesy of NISSAN NORTH AMERICA, INC.
1. Camshaft sprocket (EXH) 2. Camshaft sprocket (INT) 3. Timing chain
4. Slack guide 5. Electric intake valve timing control actuator target 6. Timing chain tensioner
7. Tension guide 8. Oil pump drive chain 9. Oil pump sprocket
10. Filter 11. O-ring 12. Valve timing control cover
13. O-ring 14. Exhaust valve timing control solenoid valve 15. Electric intake valve timing control actuator
16. Camshaft sprocket (INT) oil seal 17. Crankshaft pulley bolt 18. Crankshaft pulley
19. Front oil seal 20. O-ring 21. Front cover
22. Oil pump drive chain tensioner 23. Crankshaft key 24. Oil pump drive chain tensioner shaft
25. Crankshaft sprocket 26. Timing chain oil jet A. Refer to Removal and Installation .
B. Refer to Removal and Installation .        

SYMBOL : Indicates that the part is connected at points with the same symbol in actual vehicle.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.