2010 Infiniti M45 BaseFACTORY OEM SERVICE PROCEDURE

Overall Function Check

Use this procedure to check the overall function of the park/neutral position (PNP) signal circuit. During this check, a 1st trip DTC might not be confirmed.

WITH GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    SELECTOR LEVER POSITION CHART

    Selector lever position Voltage (Known-good data)
    P or N position Approx. 0 V
    Except above position BATTERY VOLTAGE (11 - 14 V)
  3. If NG, go to "DIAGNOSIS PROCEDUREΒ ".
Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
G04900583Courtesy of NISSAN MOTOR CO., U.S.A.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.