2005 Infiniti QX56 AWDFACTORY OEM SERVICE PROCEDURE

Basic Inspection

  1. INSPECTION STARTĀ 
    1. Check service records for any recent repairs that may indicate a related malfunction, or a current need for scheduled maintenance.
    2. Open engine hood and check the following:
      • Harness connectors for improper connections
      • Wiring harness for improper connections, pinches and cut
      • Vacuum hoses for splits, kinks and improper connections
      • Hoses and ducts for leaks
      • Air cleaner clogging
      • Gasket
    3. Confirm that electrical or mechanical loads are not applied.
      Fig 1: Checking Improper Harness Connectors
      G02384779Courtesy of NISSAN MOTOR CO., U.S.A.
      • Headlamp switch is OFF.
      • Air conditioner switch is OFF.
      • Rear window defogger switch is OFF.
      • Steering wheel is in the straight-ahead position, etc.
    4. Start engine and warm it up until engine coolant temperature indicator points the middle of gauge.

      Ensure engine stays below 1,000 RPM.

      Fig 2: Starting Engine & Warming It Up Until Engine Coolant Temperature Indicator Points To Middle Of Gauge
      G02384780Courtesy of NISSAN MOTOR CO., U.S.A.
    5. Run engine at about 2,000 RPM for about 2 minutes under no load.
    6. Make sure that no DTC is displayed with CONSULT-II or GST.

    OK or NGĀ 

    1. OK: GO TO Ā 3.
    2. NG: GO TO 2.
    Fig 3: Identifying RPM Reading - Running Engine At About 2,000 RPM For 2 Minutes Under No Load
    G02384781Courtesy of NISSAN MOTOR CO., U.S.A.
  2. REPAIR OR REPLACEĀ 

    Repair or replace components as necessary according to corresponding Diagnostic Procedure.

    1. GO TO 3.
  3. CHECK TARGET IDLE SPEEDĀ 

    With CONSULT-IIĀ 

    1. Run engine at about 2,000 RPM for about 2 minutes under no load.
    2. Rev engine (2,000 to 3,000 RPM) two or three times under no load, then run engine at idle speed for about 1 minute.
      Fig 4: Checking Target Idle Speed On Engine RPM Meter
      G02384782Courtesy of NISSAN MOTOR CO., U.S.A.
    3. Read idle speed in "DATA MONITOR" mode with CONSULT-II. Refer to "IDLE SPEEDĀ ".
      1. 650 +/- 50 RPM (in P or N position)Ā 
      Fig 5: Reading Idle Speed In "DATA MONITOR" Mode With Consult-II
      G02384783Courtesy of NISSAN MOTOR CO., U.S.A.

    Without CONSULT-IIĀ 

    1. Run engine at about 2,000 RPM for about 2 minutes under no load.
    2. Rev engine (2,000 to 3,000 RPM) two or three times under no load, then run engine at idle speed for about 1 minute.
    3. Check idle speed.

      Refer to "IDLE SPEEDĀ ".

      1. 650 +/- 50 RPM (in P or N position)Ā 

    OK or NGĀ 

    1. OK: GO TO Ā 10 0.
    2. NG: GO TO 4.
  4. PERFORM ACCELERATOR PEDAL RELEASED POSITION LEARNINGĀ 
    1. Stop engine.
    2. Perform "ACCELERATOR PEDAL RELEASED POSITION LEARNINGĀ ".
    1. GO TO 5.
  5. PERFORM THROTTLE VALVE CLOSED POSITION LEARNINGĀ 

    Perform "THROTTLE VALVE CLOSED POSITION LEARNINGĀ ".

    1. GO TO 6.
  6. PERFORM IDLE AIR VOLUME LEARNINGĀ 

    Refer to "IDLE AIR VOLUME LEARNINGĀ ".

    Is Idle Air Volume Learning carried out successfully?Ā 

    Yes or NoĀ 

    1. Yes: GO TO 7.
    2. No:
      1. Follow the instruction of Idle Air Volume Learning.
      2. GO TO Ā 4.
  7. CHECK TARGET IDLE SPEED AGAINĀ 

    With CONSULT-IIĀ 

    1. Start engine and warm it up to normal operating temperature.
    2. Read idle speed in "DATA MONITOR" mode with CONSULT-II.

      Refer to "IDLE SPEEDĀ ".

      1. 650 +/- 50 RPM (in P or N position)Ā 

    Without CONSULT-IIĀ 

    1. Start engine and warm it up to normal operating temperature.
    2. Check idle speed.

      Refer to "IDLE SPEEDĀ ".

      1. 650 +/- 50 RPM (in P or N position)Ā 

    OK or NGĀ 

    1. OK: GO TO Ā 10 0.
    2. NG: GO TO 8.
  8. DETECT MALFUNCTIONING PARTĀ 

    Check the following.

    OK or NGĀ 

    1. OK: GO TO 9.
    2. NG:
      1. Repair or replace.
      2. GO TO Ā 4.
  9. CHECK ECM FUNCTIONĀ 
    1. Substitute another known-good ECM to check ECM function. (ECM may be the cause of an incident, but this is a rare case.)
    2. Perform initialization of IVIS (NATS) system and registration of all IVIS (NATS) ignition key IDs. Refer to "ECM RE-COMMUNICATING FUNCTION ".
    1. GO TO Ā 4.
  10. CHECK IGNITION TIMINGĀ 
    1. Run engine at idle.
    2. Check ignition timing with a timing light.

      Refer to "IGNITION TIMINGĀ ".

      1. 15 +/- 5° BTDC (in P or N position) 

    OK or NGĀ 

    1. OK: GO TO Ā 19 9.
    2. NG: GO TO 11.
    Fig 6: Checking Ignition Timing
    G02384784Courtesy of NISSAN MOTOR CO., U.S.A.
  11. PERFORM ACCELERATOR PEDAL RELEASED POSITION LEARNINGĀ 
    1. Stop engine.
    2. Perform "ACCELERATOR PEDAL RELEASED POSITION LEARNINGĀ ".
    1. GO TO 12.
  12. PERFORM THROTTLE VALVE CLOSED POSITION LEARNINGĀ 

    Perform "THROTTLE VALVE CLOSED POSITION LEARNINGĀ ".

    1. GO TO 13.
  13. PERFORM IDLE AIR VOLUME LEARNINGĀ 

    Refer to "IDLE AIR VOLUME LEARNINGĀ ".

    Is Idle Air Volume Learning carried out successfully?Ā 

    Yes or NoĀ 

    1. Yes: GO TO 14.
    2. No:
      1. Follow the instruction of Idle Air Volume Learning.
      2. GO TO Ā 4.
  14. CHECK TARGET IDLE SPEED AGAINĀ 

    With CONSULT-IIĀ 

    1. Start engine and warm it up to normal operating temperature.
    2. Read idle speed in "DATA MONITOR" mode with CONSULT-II.

      Refer to "IDLE SPEEDĀ ".

      1. 650 +/- 50 RPM (in P or N position)Ā 

    Without CONSULT-IIĀ 

    1. Start engine and warm it up to normal operating temperature.
    2. Check idle speed.

      Refer to "IDLE SPEEDĀ ".

      1. 650 +/- 50 RPM (in P or N position)Ā 

    OK or NGĀ 

    1. OK: GO TO 15.
    2. NG: GO TO Ā 17.
  15. CHECK IGNITION TIMING AGAINĀ 
    1. Run engine at idle.
    2. Check ignition timing with a timing light.

      Refer to "IGNITION TIMINGĀ ".

      1. 15 +/- 5° BTDC (in P or N position  )

    OK or NGĀ 

    1. OK: GO TO Ā 19.
    2. NG: GO TO 16.
    Fig 7: Checking Ignition Timing
    G02384785Courtesy of NISSAN MOTOR CO., U.S.A.
  16. CHECK TIMING CHAIN INSTALLATIONĀ 

    Check timing chain installation. Refer to "TIMING CHAIN ".

    OK or NGĀ 

    1. OK: GO TO 17.
    2. NG:
      1. Repair the timing chain installation.
      2. GO TO Ā 4.
  17. DETECT MALFUNCTIONING PARTĀ 

    Check the following.

    OK or NGĀ 

    1. OK: GO TO 18.
    2. NG:
      1. Repair or replace.
      2. GO TO Ā 4.
  18. CHECK ECM FUNCTIONĀ 
    1. Substitute another known-good ECM to check ECM function. (ECM may be the cause of an incident, but this is a rare case.)
    2. Perform initialization of IVIS (NATS) system and registration of all IVIS (NATS) ignition key IDs. Refer to "ECM RE-COMMUNICATING FUNCTION ".
    1. GO TO Ā 4.
  19. INSPECTION ENDĀ 

    Did you replace ECM, referring this Basic Inspection procedure?

    Yes or NoĀ 

    1. Yes:
      1. Perform "VIN REGISTRATIONĀ ".
      2. INSPECTION ENDĀ 
    2. No: INSPECTION ENDĀ 
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.