2005 Infiniti Q45FACTORY OEM SERVICE PROCEDURE

Operation Procedure

  1. Turn ignition switch OFF.
  2. Connect CONSULT-II to and CONSULT-II CONVERTER data link connector.
    CAUTION: If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on control unit which carry out CAN communication.
  3. Turn ignition switch ON.
  4. Touch "START (NISSAN BASED VHCL)" on display.
  5. Touch "VDC" on display. If "VDC" is not indicated, go to "CONSULT-II DATA LINK CONNECTOR (DLC) CIRCUIT ".
    CAUTION: When "START (NISSAN BASED VHCL)" is touched immediately after starting engine or turning on ignition switch, "VDC" might not be displayed in the system selection screen. In this case, repeat the operation from step 1.
  6. Touch "DATA MONITOR".
  7. Return to monitor item selection screen, and touch any of "CONTROL UNIT INPUT ITEM", "MAIN ITEM" or "ITEM MENU SELECTION". Refer to "DISPLAY ITEM LISTΒ ".
  8. Touch "START".
  9. Screen of data monitor is displayed.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.