2004 Infiniti QX56 AWDFACTORY OEM SERVICE PROCEDURE

CONSULT-II Basic Operation Procedure

  1. Turn ignition switch OFF.
  2. Connect CONSULT-II and CONSULT-II CONVERTER to the data link connector.
    CAUTION: If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on control unit which carries out CAN communication.
  3. Turn ignition switch ON.
  4. Fig 1: Identifying Brake Pedal And Data Link Connector
    G02250699Courtesy of NISSAN MOTOR CO., U.S.A.
  5. Touch "START (NISSAN BASED VHCL)".
  6. Fig 2: CONSULT-II Start Screen
    G02250700Courtesy of NISSAN MOTOR CO., U.S.A.
  7. Touch "ABS" in the "SELECT SYSTEM" screen.

    If "ABS" is not indicated, go to CONSULT-II DATA LINK CONNECTOR (DLC) CIRCUIT .

  8. Fig 3: CONSULT-II Select System Screen
    G02250701Courtesy of NISSAN MOTOR CO., U.S.A.
  9. Select the required diagnostic location from the "SELECT DIAG MODE" screen. For further information, see the CONSULT-II Operation Manual.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.