2004 Infiniti M45FACTORY OEM SERVICE PROCEDURE

3. Check EVAP Control System Pressure Sensor Power Supply Circuit

  1. Turn ignition switch ON.
  2. Check voltage between EVAP control system pressure sensor terminal 1 and ground with CONSULT-II or tester.
    Fig 1: Checking Voltage Between EVAP Control System Pressure Sensor Terminal 1 & Ground
    G00796082Courtesy of NISSAN MOTOR CO., U.S.A.

    Voltage: Approximately 5V 

OK or NG 

  1. OK: GO TO 5. CHECK EVAP CONTROL SYSTEM PRESSURE SENSOR GROUND CIRCUIT FOR OPEN AND SHORT .
  2. NG: GO TO 4.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.