Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
Diagnostic Procedure
- Check Ground ConnectionsÂ
- Turn ignition switch OFF.
- Loosen and retighten three ground screws on the body. See Figure
.
Refer to GROUND INSPECTIONÂ .
OK or NG
- OK: go to 2.
- NG: Repair or replace ground connections.
- Check Intake Valve Timing Control Position Sensor Power Supply CircuitÂ
- Disconnect intake valve timing control position sensor harness connector.
- Turn ignition switch ON.
- Check voltage between intake valve timing control position sensor terminal 3 and ground with CONSULT-II or tester.
- Voltage: Battery voltageÂ
OK or NG
- Detect Malfunctioning PartÂ
Check the following.
- Harness connectors E211, M41
- Harness connectors F102, M82
- Harness for open or short between intake valve timing control position sensor and ECM
- Harness for open or short between intake valve timing control position sensor and IPDM E/R
- Repair open circuit or short to ground or short to power in harness or connectors.
- Check Intake Valve Timing Control Position Sensor Ground Circuit For Open And ShortÂ
- Turn ignition switch OFF.
- Check harness continuity between intake valve timing control position sensor terminal 1 and ground. Refer to wiring diagram. See Figure
or Figure
.
- Continuity should exist .
- Also check harness for short to power.
OK or NG
- Detect Malfunctioning PartÂ
Check the following.
- Harness connectors F102, M82
- Harness for open or short between intake valve timing control position sensor and ground
- Repair open circuit or short to power in harness or connectors.
- Check Intake Valve Timing Control Position Sensor Input Signal Circuit For Open And ShortÂ
- Disconnect ECM harness connector.
- Check harness continuity between ECM terminal 72 and intake valve timing control position sensor (bank 1) terminal 2 or ECM terminal 53 and intake valve timing control position sensor (bank 2) terminal 2.
Refer to wiring diagram. See Figure or Figure .
- Continuity should exist .
- Also check harness for short to ground and short to power.
OK or NG
- OK: go to  7 .
- NG: Repair open circuit or short to ground or short to power in harness or connectors.
- Check Intake Valve Timing Control Position SensorÂ
Refer to COMPONENT INSPECTIONÂ .
OK or NG
- OK: go to  8 .
- NG: Replace intake valve timing control position sensor.
- Check Intake Valve Timing Control Solenoid Valve Power Supply CircuitÂ
- Disconnect intake valve timing control solenoid valve harness connector. See Fig 1 .
- Turn ignition switch ON.
- Check voltage between intake valve timing control solenoid valve terminal 2 and ground with CONSULT-II or tester.Fig 3: Checking Voltage Between Intake Valve Timing Control Solenoid Valve Terminal 2 & Ground (W/DVOM)
Courtesy of NISSAN MOTOR CO., U.S.A.
- Voltage: Battery voltageÂ
OK or NG
- Detect Malfunctioning PartÂ
Check the following.
- Harness connectors E19, F49
- Harness for open or short between intake valve timing control solenoid valve and IPDM E/R
- Repair open circuit or short to ground or short to power in harness or connectors.
- Check Intake Valve Timing Control Solenoid Valve Output Signal Circuit For Open And ShortÂ
- Check harness continuity between ECM terminal 10 and intake valve timing control solenoid valve (bank 1) terminal 1 or ECM terminal 11 and intake valve timing control solenoid valve (bank 2) terminal 1. Refer to wiring diagram. See Figure
or Figure
.
- Continuity should exist .
- Also check harness for short to ground and short to power.
OK or NG
- OK: go to  11 .
- NG: Repair open circuit or short to ground or short to power in harness or connectors.
- Check harness continuity between ECM terminal 10 and intake valve timing control solenoid valve (bank 1) terminal 1 or ECM terminal 11 and intake valve timing control solenoid valve (bank 2) terminal 1. Refer to wiring diagram. See Figure
or Figure
.
- Check Intake Valve Timing Control Solenoid ValveÂ
Refer to COMPONENT INSPECTIONÂ .
OK or NG
- OK: go to  12 .
- NG: Replace intake valve timing control solenoid valve.
- Check Crankshaft Position Sensor (POS)Â
Refer to COMPONENT INSPECTIONÂ .
OK or NG
- OK: go to  13 .
- NG: Replace crankshaft position sensor (POS).
- Check Camshaft Position Sensor (Phase)Â
Refer to COMPONENT INSPECTIONÂ .
OK or NG
- OK: go to  14 .
- NG: Replace camshaft position sensor (PHASE).
- Check CamshaftÂ
Check accumulation of debris to the signal pick-up portion of the camshaft. Refer to CAMSHAFT .
OK or NG
- OK: go to  15 .
- NG: Remove debris and clean the signal pick-up cutout of camshaft.
- Check Intermittent IncidentÂ
Refer to TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENTÂ
For wiring diagram, refer to WIRING DIAGRAMÂ for CKP sensor (POS), and WIRING DIAGRAMÂ for CMP sensor (PHASE).
- Inspection endÂ
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- • You smell fuel, burning insulation, or see smoke.
- • Brakes feel soft, pull hard to one side, or make grinding noises.
- • The engine overheats, stalls repeatedly, or misfires under load.
- • You are missing required tools, torque specs, or safe lifting equipment.
- • You are not confident in the next step or safety outcome.
