2002 Infiniti I35FACTORY OEM SERVICE PROCEDURE

EGR Monitor

NOTE: Once procedure is started DO NOT turn ignition off. When negative battery cable is disconnected, all readiness test codes are cleared.
  1. Connect scan tool to DLC. Start engine, and hold at 3000 RPM under no load condition with transaxle in Park or Neutral until radiator cooling fan comes on.
  2. Drive vehicle at a steady speed between 50-62 MPH with transaxle in D4 position for more than 10 seconds.
  3. With transaxle in D4 position, decelerate from 62 MPH by completely releasing throttle for at least 5 seconds. If engine is stalls or is stopped during this part of the procedure, repeat procedure starting in step Β 2. After procedure is complete, use scan too to check readiness code.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.