2014 Hyundai Veloster Base, Standard TransFACTORY OEM SERVICE PROCEDURE

Power Circuit Inspection

  • Check voltage 
    1. IG "OFF" & Disconnect HO2S (S2) connector.
    2. IG "ON".
    3. Measure voltage between power terminal of the OCV harness connector and chassis ground.

      Specification:  B+

      Fig 1: Measuring Voltage Between Power Terminal Of OCV Harness Connector And Chassis Ground
      G08813393Courtesy of HYUNDAI MOTOR AMERICA
    4. Is the measured voltage within specification?

      YES 

      Go to "CONTROL CIRCUIT INSPECTION " procedure.

      NO 

      Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.