Signal Circuit Inspection

2013 Hyundai Genesis Coupe 2.0T PremiumSECTION Signal Circuit Inspection
WARNING: This page is about a different car, the 2012 Hyundai Genesis Coupe. However, it is still accessible from the selected car via links, so may be relevant.
  • Check for Short to Ground in Signal Circuit 
    1. IG KEY OFF.
    2. Disconnect ECM and A/C pressure sensor harness connector.
    3. Measure resistance between signal terminal of A/C pressure harness connector and chassis ground.

      Specification  : Infinite

      Fig 1: Measuring Resistance Between Signal Terminal Of A/C Pressure Harness Connector & Chassis Ground
      G00520384Courtesy of HYUNDAI MOTOR CO.
    4. Is resistance within specification?

      YES 

      • Go to next step.

      NO 

  • Check for Open in Signal Circuit 
    1. IG KEY OFF.
    2. Disconnect A/C pressure sensor harness connector.
    3. Measure resistance between both ends of signal line.

      Specification  : Below 1Ω

      Fig 2: Measuring Resistance Between Both Ends Of Signal Line
      G00520385Courtesy of HYUNDAI MOTOR CO.
    4. Is resistance within specification?

      YES 

      • Go to next Inspection procedure.

      NO 

RENDER: 1.0x

NO RELATED

Recommended Tools & Savings

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Affiliate disclosure: We may earn a commission at no extra cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • You smell fuel, burning insulation, or see smoke.
  • Brakes feel soft, pull hard to one side, or make grinding noises.
  • The engine overheats, stalls repeatedly, or misfires under load.
  • You are missing required tools, torque specs, or safe lifting equipment.
  • You are not confident in the next step or safety outcome.