2011 Hyundai Azera GLSFACTORY OEM SERVICE PROCEDURE

Repair Procedures: Installation

  1. Installation is reverse of removal.

    CVVT oil control valve installation bolt:Β 

    9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lbf.ft)

    CAUTION: Pay attention to color of valve connector (Component and harness side) when installing. If an OCV is installed on opposite bank, the engine may be damaged.
    CONNECTOR COLOR

    Item Component
    Side
    Harness Side
    Bank1 (RH) Grey
    Bank 2(LH) Black
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.