2012 Honda Insight BaseFACTORY OEM SERVICE PROCEDURE

EPS Control Unit Removal/Installation

  1. Do the 12 volt battery terminal disconnection procedure (see USING THE GR8 BATTERY DIAGNOSTIC STATION ).
  2. Remove the driver's dashboard undercover (see DRIVER'S DASHBOARD UNDERCOVER REMOVAL/INSTALLATION ).
  3. Disconnect EPS control unit connector A (2P), connector B (2P), and connector C (16P).
    Fig 1: EPS Control Unit Connector A (2P), Harness Clip And Nuts With Torque Specifications
    G08093579Courtesy of AMERICAN HONDA MOTOR CO., INC.
  4. Remove the harness clip (D) from EPS control unit bracket (E).
  5. Remove the nuts (F) from the EPS control unit bracket.
  6. Remove the EPS control unit.
  7. Install the EPS control unit in the reverse order of removal.
  8. Do the 12 volt battery terminal reconnection procedure (see USING THE GR8 BATTERY DIAGNOSTIC STATION ).
  9. Do the memorizing of the torque sensor neutral position (see MEMORIZING THE TORQUE SENSOR NEUTRAL POSITIONΒ ).
  10. After installation, start the engine, allow it to idle, and turn the steering wheel to full left or full right. Check that the EPS indicator does not come on.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.