2012 Honda Insight BaseFACTORY OEM SERVICE PROCEDURE

Park Pin Switch Test

  1. Remove the center console (see CENTER CONSOLE REMOVAL/INSTALLATION ).
  2. Disconnect the park pin switch 2P connector (A).
    Fig 1: Identifying Park Pin Switch 2P Connector Terminals
    G08094531Courtesy of AMERICAN HONDA MOTOR CO., INC.
  3. Check for continuity between terminals No. 1 and No. 2.
    • There should be continuity when the shift lever button is pressed or the shift lever is moved out of P.
    • There should be no continuity when the shift lever is moved to P and the shift lever button is released.
  4. If the continuity is not as specified, check the shift cable adjustment (see SHIFT CABLE ADJUSTMENT ). If the cable adjustment is OK, go to step 5. If the park pin switch fails the test, replace the park pin switch (see PARK PIN SWITCH REPLACEMENT ).
  5. Install the parts in the reverse order of removal (see CENTER CONSOLE REMOVAL/INSTALLATION ).
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.