1990 Geo Metro L3-61 1.0LFACTORY OEM SERVICE PROCEDURE

Engine Control Module: Locations

ECM Wiring Location:

Factory service manual diagram







1 = RADIATOR COOLING FAN MOTOR SWITCH
2 = COOLANT TEMPERATURE GAUGE SENSING UNIT
3 = EXHAUST GAS RECIRCULATION VACUUM SWITCHING VALVE
4 = AIR TEMPERATURE SENSOR
5 = COOLANT TEMPERATURE SENSOR
6 = THROTTLE POSITION SWITCH (M/T ONLY), THROTTLE POSITION SENSOR (A/T ONLY)
7 = FUEL INJECTOR
8 = MANIFOLD ABSOLUTE PRESSURE SENSOR CONNECTOR
9 = GENERATOR CONNECTIONS
10 = STARTER MOTOR CONNECTION
11 = GROUND CONNECTION
12 = IDLE SPEED CONTROL SOLENOID VALVE
13 = BATTERY POSITIVE TERMINAL
14 = ENGINE WIRING HARNESS
15 = DISTRIBUTOR WIRING
16 = OXYGEN SENSOR CONNECTOR
17 = OIL PRESSURE SWITCH CONNECTOR


Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.