2017 GMC Acadia SLFACTORY OEM SERVICE PROCEDURE

Oil Pump Flow Control Valve Replacement

Fig 1: Oil Pump Flow Control Valve
GM4174366Courtesy of GENERAL MOTORS COMPANY
Callout Component Name
Preliminary Procedure 
Remove Oil Pump Flow Control Valve Heat Shield. Refer to Oil Pump Flow Control Valve Heat Shield Replacement 
1 Oil Pump Flow Control Solenoid Valve Electrical Connector
2 Oil Pump Flow Control Valve Fastener
CAUTION:

Refer to Fastener Caution .


Tighten 
10 N.m (89 lb in)
3 Oil Pump Flow Control Valve
Procedure 
Install a NEW O-ring seal.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.