1992 GMC Safari Van Cargo, 4.3 Z, AWDFACTORY OEM SERVICE PROCEDURE

Glow Plug Controller

  1. Ensure coolant temperature is less than 80Β°F (27Β°C) before beginning test. Place ignition switch in RUN position and allow glow plugs to cycle. After 2 minutes, crank engine for one second. It is NOT important that the engine starts. Return ignition switch to RUN position. Glow plugs should cycle on at least once.
  2. If glow plugs do not cycle, disconnect controller (controller is located on top, rear of valve cover). Connect a 12-volt test light between Purple/White wire terminal of harness connector (terminal "B") and ground. See Figure. With ignition switch in RUN position, test light should be off. Test light should glow when engine is cranked.
  3. If test light does not glow as specified, repair short or open in engine harness Purple/White wire. If test light operates properly but glow plugs did not cycle, replace controller.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.

Rather have a pro handle this?

A certified mobile mechanic comes to your home or office. They bring the tools, you stay comfortable. No tow truck, no waiting room, no surprises.

Comes to youSame-day available12-month warranty
Get a Free Quote

No obligation. See pricing before you book.