2007 Freightliner Sprinter 2500 V6-3.0L DSL TurboFACTORY OEM SERVICE PROCEDURE

Rear Blower Motor Power Module - Installation






INSTALLATION

Factory service manual diagram



1. Position the rear blower motor power module (3) to the rear evaporator housing (1) and connect the wire harness connector (2) to the module.
2. Install the rear blower motor power module into the rear evaporator housing and rotate the module a 1/4 turn clockwise until it is fully seated in the housing. Make sure the power module is fully engaged to the housing.

Factory service manual diagram



3. Install the rear evaporator trim panel (10) and retaining screws (6). Tighten the screws to 2 Nm (17 in. lbs.).
4. Install the air intake grille (5) onto the rear evaporator trim panel. Make sure the retaining tabs are fully engaged to the trim panel.
5. Install the front, center and rear roof duct trim panels (2, 9 and 8) and retaining screws (4 and 7). Tighten the screws to 2 Nm (17 in. lbs.).
6. Install the dome lamps (3).
7. Install the air outlets (1).
8. Reconnect the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.