2003 Freightliner Sprinter 2500 L5-2.7L DSL TurboFACTORY OEM SERVICE PROCEDURE

Timing Chain

Timing Chain, Chain Tensioner
Bolt-Camshaft Sprocket to Exhaust Camshaft 18 Nm (159 inch lbs.)
Bolt-Intermediate Gear of High Pressure Pump to Cylinder Head 40 Nm (29.5 ft. lbs.)
Timing Chain Tensioner to Timing Case Cover 80 Nm (59 ft. lbs.)
Factory service manual diagram




Timing Case Cover
Install the M8 bolts of cylinder head on timing case cover.
Tighten bolts to 20 Nm (177 inch lbs.) (Fig. 65).
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.