2003 Freightliner Sprinter 2500 L5-2.7L DSL TurboFACTORY OEM SERVICE PROCEDURE

Exhaust Gas Recirculation: Service and Repair

REMOVAL

Mixing Chamber And EGR Positioner:

Factory service manual diagram



1. Disconnect the negative battery cable.
2. Lift up on the charge air hose retaining clip at the mixing chamber and disconnect hose with seal.
3. Disconnect the electrical connector at the EGR positioner.
4. Remove mixing chamber support bracket.
5. Remove the mixing chamber retaining bolts and remove chamber.

INSTALLATION
1. Clean all gasket mating surfaces.
2. Position the mixing chamber to the intake manifold with a new gasket, install bolts and tighten to 124 lbs.in (14 N.m).
3. Install the mixing chamber support bracket and tighten the bolts to 124 lbs.in (14 N.m).
4. Connect the EGR positioner electrical connector.
5. Inspect the seal of the charge air inlet tube, replace as necessary.
6. Seat the charge air tube with gasket into the mixing chamber and push down on the charge air tube retaining clip.
7. Connect negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.