1971 Ford P-100FACTORY OEM SERVICE PROCEDURE

Test Procedures

VOLTAGE TESTS(1) SPECIFICATIONS CORRECTIONS
With Key On     
Pin #3 and engine ground Battery voltage ±. 1V Module bias test
Pin #5 and engine ground Battery voltage ±.1V Battery source test
While Cranking Engine     
Pin #1 and engine ground 8 to 12 volts Cranking test
Pin #5 and engine ground 8 to 12 volts Starting circuit test
Pin #7 and pin #8 Any D.C. wiggle 1/2 V. min. Distributor hardware test
(1) Make test between points indicated.
RESISTANCE TESTS(1) SPECIFICATIONS CORRECTIONS
With Key Off     
Pin #7 and pin #8 400 to 800 ohms Magnetic pickup stator test
Pin #6 and engine ground 0 ohms
Pin #7 and engine ground more than 70, 000 ohms
Pin #8 and engine ground more than 70, 000 ohms
Pin #3 and coil tower 7, 000 to 13, 000 ohms Ignition coil test
Pin #5 and pin #4 1.0 to 2.0 ohms
Pin #5 and engine ground more than 4.0 ohms Short test
Pin #3 and pin #4 1.0 to 2.0 ohms Resistance wire test
(1) Make test between points indicated.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.