1981 Fiat Strada 2D Hatchback, Automatic TransFACTORY OEM SERVICE PROCEDURE

Ground Circuit Check

  1. Turn ignition switch "OFF". Connect ohmmeter leads to battery ground terminal and ignition coil ground stud. See Fig 1.
    Fig 1: Ohmmeter Hookup for Ground Circuit Check
    G09314177Courtesy of NOT AVAILABLE
  2. Resistance reading should be less than 0.2 ohms. If resistance is higher, check support, mounting and battery ground connections. Also check that control module casing is clean and that all mounting bolts are clean and tight.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.