1976 Fiat Spider Automatic TransFACTORY OEM SERVICE PROCEDURE

Diode Checks

  1. Connect leads of an ohmmeter to terminal 30 and stator winding connector. Check resistance, then reverse leads and recheck. Both readings should show high resistance with one reading being slightly higher than the other. If both readings are low, a positive diode is bad.
  2. Check resistance between ground and stator winding connector. Reverse leads and check reading. If both readings are low, a negative diode is bad.
  3. Check resistance between energizing diode plug and stator winding connector. Reverse leads and check reading. If both readings are low, an energizing diode is bad.
    Fig 1: Marelli Alternator Test Points
    G09334913Courtesy of NOT AVAILABLE
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.