2004 Dodge and Ram Neon SE, AutomaticFACTORY OEM SERVICE PROCEDURE

Installation - 2.0L

  1. Install the assembly, PCM and bracket.
  2. Loose install the mounting nut.
  3. Install the mounting bolts to the bottom of the PCM bracket (Figure).
  4. Tighten the mounting nut, tighten to
  5. Install the wiring harness clip (Figure) to the PCM bracket.
    NOTE: The electrical connector for the PCM are COLOR Coded.
  6. Connect the electrical connectors and lock (Figure) at the PCM.
  7. Install the air cleaner box (Figure). Refer to AIR CLEANER HOUSING (2.0L), or AIR CLEANER HOUSING (2.4L) for more information.
  8. Connect the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.