2004 Dodge and Ram Neon SE, AutomaticFACTORY OEM SERVICE PROCEDURE

Removal - 1.6L

  1. Disconnect the negative battery cable.
  2. Remove the air cleaner box.
  3. Disconnect the Powertrain Control Module connector (Fig 1).
    Fig 1: Locating PCM (1.6L)
    G03537688Courtesy of DAIMLERCHRYSLER CORP.
  4. Remove the 4 bolts (Fig 2).
    Fig 2: Identifying PCM Bolts (1.6L)
    G03537689Courtesy of DAIMLERCHRYSLER CORP.
  5. Remove the PCM from bracket.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.