2000 Dodge and Ram Neon High Line, AutomaticFACTORY OEM SERVICE PROCEDURE

Removal & Installation

WARNING: This page is about the Neon Base, Automatic, which is a different variant/trim than selected.

3 SPEED TRANS

Applies ToNoteStandard HoursWarranty HoursSkill Level
Trans Mfr CD 31TH3.8C
Combination Procedure: CLUTCH SEALS: Remove & Replace:
Trans Mfr CD 31TH, Front or Rear1.11.1A
Combination Procedure: FLYWHEEL: Remove & Replace:
Trans Mfr CD 31TH0.50.3C
Combination Procedure: KICKDOWN BAND: Remove & Replace:
Trans Mfr CD 31TH0.90.9A
Combination Procedure: OIL PUMP: Remove & Replace:
Trans Mfr CD 31TH, Front0.60.6B
Combination Procedure: REACTION SHAFT: Remove & Replace:
Trans Mfr CD 31TH0.60.6A
Combination Procedure: REVERSE BAND: Remove & Replace:
Trans Mfr CD 31TH1.11.1A
Combination Procedure: SPEEDOMETER DRIVE GEAR: Remove & Replace:
Trans Mfr CD 31TH1.5B
Combination Procedure: TORQUE CONVERTER: Remove & Replace:
Trans Mfr CD 31TH0.20.2C
Combination Procedure: TRANSAXLE ASSEMBLY: Replace:
Trans Mfr CD 31TH0.60.4C
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.