2011 Chrysler 300 Base, GasFACTORY OEM SERVICE PROCEDURE

5.7L Engine

Fig 1: Thermostat Housing, Water Pump, Belt Tensioner, & Idler Pulley
GC0137090Courtesy of CHRYSLER LLC
  1. Clean mating surfaces and install water pump (3). Tighten mounting bolts to 24 N.m (18 ft. lbs.).
  2. Install upper metal heater tube.
  3. Install belt tensioner assembly (4). Refer to TENSIONER, Belt, Installation .
  4. Install idler pulley (5).
  5. Install the lower radiator hose.
  6. Install serpentine belt. Refer to BELT, Serpentine, Installation .
  7. Install the resonator mounting bracket.
  8. Install cooling fan assembly. Refer to FAN, Cooling, Installation .
  9. Install the upper radiator hose to the thermostat housing (1).
  10. Install the air intake assembly. Refer to BODY, Air Cleaner, Installation, 3.6L or BODY, Air Cleaner, Installation, 5.7L .
  11. Connect negative battery cable.
  12. Evacuate air and refill cooling system. Refer to Standard Procedure .
  13. Check cooling system for leaks. Refer to Diagnosis and Testing .
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.