2010 Chrysler PT CruiserFACTORY OEM SERVICE PROCEDURE

MODULE, Powertrain Control: Removal: Removal

Fig 1: Vacuum Lines
GC0114270Courtesy of CHRYSLER LLC
  1. Disconnect the negative battery cable.
  2. Remove plastic clips that hold the wiring harness to the support bracket.
    Fig 2: Electrical Connectors
    GC0114271Courtesy of CHRYSLER LLC
    1 - Electrical Connectors
  3. Unlock and disconnect the 3 or 4 electrical connectors (1) from the Powertrain Control Module (PCM).
    Fig 3: Clutch Reservoir
    GC0114272Courtesy of CHRYSLER LLC
  4. Remove the clutch reservoir and relocate.
    Fig 4: PCM And Mounting Bracket
    GC0114273Courtesy of CHRYSLER LLC
  5. Remove the four mounting bolts from the PCM mounting bracket.
    Fig 5: PCM Removal/Installation
    GC0114274Courtesy of CHRYSLER LLC
  6. Remove PCM and mounting bracket.
    Fig 6: PCM And Mounting Bracket
    GC0114273Courtesy of CHRYSLER LLC
  7. Remove the three mounting bolts from the PCM bracket to PCM.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.