2009 Chrysler Sebring Convertible V6-3.5LFACTORY OEM SERVICE PROCEDURE

Knock Sensor - Installation






3.5L

Factory service manual diagram





CAUTION: Always use the specified torque when installing the knock sensor bolt. Over or under tightening the sensor mounting bolt will affect knock sensor performance, possibly causing improper spark control.

1. Install knock sensor. Tighten knock sensor to 20 Nm (15 ft. lbs.).
2. Route the knock sensor wire in the proper location.

Factory service manual diagram




3. Connect the electrical connector.

Factory service manual diagram




4. Install the upper and lower intake manifolds, Intake Manifold - Installation.

Factory service manual diagram




5. Install the air cleaner body Air Cleaner Body - Installation
6. Connect the negative battery cable, tighten nut to 5 Nm (45 in. lbs.).
7. Fill cooling system Service and Repair.
8. Operate engine until it reaches normal operating temperature. Check cooling system for correct fluid levels.
9. Install the engine cover.

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.