2009 Chrysler Sebring Base, 2D Convertible, EDGFACTORY OEM SERVICE PROCEDURE

Diesel Engine

Fig 1: POWER STEERING PUMP - DIESEL
GC0082524Courtesy of CHRYSLER LLC
  1. Using a lint free towel, wipe clean the open power steering pressure hose end and the power steering pump port. Replace any used O-rings with new. Lubricate the O-ring with clean power steering fluid.
  2. Place the pump in mounting position. Install the two mounting bolts (1) through the pulley (2) openings. Tighten the mounting bolts to 30 N.m (22 ft. lbs.).
    Fig 2: THIRD MOUNTING BOLT - DIESEL
    GC0082525Courtesy of CHRYSLER LLC
  3. Install the rear mounting bolt (2) securing the rear of the pump (1). Tighten the mounting bolt to 30 N.m (22 ft. lbs.).
  4. Install the drive belt. Refer to Cooling/Accessory Drive/BELT, Serpentine - Installation
    Fig 3: SUPPLY HOSE
    GC0082523Courtesy of CHRYSLER LLC
  5. Install the supply hose (1) at the pump (2).
  6. Clamp the hose clamp (3) securing the supply hose (1) to the pump.
    Fig 4: PRESSURE LINE
    GC0082522Courtesy of CHRYSLER LLC
  7. Install the pressure hose (3) at the pump pressure port (4). Tighten the tube nut to 32 N.m (24 ft. lbs.).
  8. Install the pressure hose routing bracket bolt (2) to the engine mount (7). Tighten the bolt to 24 N.m (18 ft. lbs.).
  9. Fill and bleed the power steering system. See Steering - Standard ProcedureΒ 
  10. Check for leaks.
  11. Install the engine appearance cover.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.