2009 Chrysler Sebring Base, 2D Convertible, EDGFACTORY OEM SERVICE PROCEDURE

Battery System: Specifications: Torque

TORQUE SPECIFICATIONS

DESCRIPTION N.m Ft. Lbs.Β  In. Lbs.Β 
Battery Terminal Clamp Pinch-Bolt Hex Nut 5 - 45
Negative Battery Cable Remote Terminal Nut 16.5 - 145
Positive Battery Cable Remote Terminal Nut 16.5 - 145
Battery Hold Down Bolt 16 - 142
Starter Solenoid B(+) Terminal Stud Nut 13 - 115
Battery Negative Cable Ground Eyelet Terminal To Engine Block Bolt 16.5 - 145
Totally Integrated Power Module B(+) Terminal Stud Nut 10 - 90
Battery Tray Support Bolt 16 - 142
Battery Tray Bolt 16 - 142
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.