2007 Chrysler Crossfire Base, 2D ConvertibleFACTORY OEM SERVICE PROCEDURE

P0418-Secondary Air Injection System Control Circuit: Notes

Fig 1: Air Pump System Circuit Schematic
GC0034257Courtesy of CHRYSLER LLC
  1. When Monitored  : Once per driving cycle when the Engine is at idle, Air Pump was activated at start-up, Barometric Pressure greater than 78 kPa (11 psi), Engine Coolant Temperature is greater than 50°C (122°F), and no other DTCs.
  2. Set Condition  : When the test is enabled, the O2 Sensor must increase by at least 23% (rich).
Possible Causes 
AIR PUMP RELAY CONTROL CIRCUIT OPEN
AIR PUMP RELAY CONTROL CIRCUIT SHORT TO GROUND
AIR PUMP RELAY CONTROL CIRCUIT SHORT TO VOLTAGE
AIR PUMP RELAY CONTROL CIRCUIT SHORT TO AIR PUMP RELAY OUTPUT CIRCUIT
RELAY CONTROL MODULE
POWERTRAIN CONTROL MODULE

For a complete Powertrain Control Module Circuit Diagram, refer to SCHEMATICS AND DIAGRAMS .

Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.