2007 Chrysler 300 BaseFACTORY OEM SERVICE PROCEDURE

Sensor-Variable Line Pressure: Removal

Fig 1: Identifying Variable Line Pressure Sensor & Pressure Control Solenoid
GC0038109Courtesy of CHRYSLER LLC
1 - PRESSURE CONTROL SOLENOID
2 - LINE PRESSURE SENSOR
3 - SHOULDER SCREW
4 - VARIABLE LINE PRESSURE HEADER
5 - MANUAL SHAFT
6 - SCREWS
  1. Remove the valve body from the transmission. See REMOVALΒ .
  2. Remove the electrical connectors from the pressure control solenoid (1) and the line pressure sensor (2). See Fig 1.
  3. Remove the screws (6) holding the pressure control solenoid (1) and line pressure sensor (2) to the valve body.
  4. Remove the pressure control solenoid and line pressure sensor from the valve body.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.