2007 Chrysler 300 BaseFACTORY OEM SERVICE PROCEDURE

Diagnostic Test

  1. 1) DTC IS ACTIVE 

    Turn the ignition on.

    With the scan tool, Clear DTCs in the Powertrain Control Module (PCM).

    Start the engine and allow it to reach operating temperature.

    WARNING: When the engine is operating, do not stand in direct line with the fan. Do not put your hands near the pulleys, belts, or fan. Do not wear loose clothing. Failure to follow these instructions can result in personal injury or death.

    Increase engine speed by pressing the accelerator pedal. Do not exceed 3500 rpm.

    With the scan tool, select View DTCs.

    Is the status Active for this DTC? 

    Yes 

    1. Go to  2).

    No 

    1. Refer to *CHECKING FOR AN INTERMITTENT DTC .
  2. 2) (Z904) GROUND CIRCUIT OPEN OR HIGH RESISTANCE 
    Fig 1: Checking Generator Field Ground Circuit
    GC0015050Courtesy of CHRYSLER LLC

    Turn the ignition off.

    Disconnect the Generator connector.

    Measure the resistance between ground and the (Z904) Ground circuit in the Generator harness connector.

    Is the resistance below 5.0 ohms? 

    Yes 

    1. Go to  3).

    No 

    1. Repair the (Z904) Ground circuit for an open circuit or high resistance.
    2. Perform *PCM VERIFICATION TEST .
  3. 3) (K20) GEN FIELD CONTROL CIRCUIT SHORTED TO VOLTAGE 
    Fig 2: Checking Generator Field Control Circuit
    GC0015052Courtesy of CHRYSLER LLC

    Turn the ignition off.

    Disconnect the Powertrain Control Module (PCM) connector.

    Turn the ignition on.

    Measure the voltage of the (K20) Gen Field Control circuit in the Generator harness connector.

    Is there any voltage present? 

    Yes 

    1. Repair the (K20) Gen Field Control circuit for a short to voltage.
    2. Perform *PCM VERIFICATION TEST .

    No 

    1. Go to  4).
  4. 4) (K20) GEN FIELD CONTROL CIRCUIT SHORTED TO GROUND 
    Fig 3: Checking Generator Field Control Circuit
    GC0015049Courtesy of CHRYSLER LLC

    Turn the ignition off.

    Measure the resistance between ground and the (K20) Gen Field Control circuit in the Generator harness connector.

    Is the resistance above 100 ohms? 

    Yes 

    1. Go to  5).

    No 

    1. Repair the (K20) Gen Field Control circuit for a short to ground.
    2. Perform *PCM VERIFICATION TEST .
  5. 5) (K20) GEN FIELD CONTROL CIRCUIT OPEN OR HIGH RESISTANCE 
    Fig 4: Checking Generator Field Control Circuit
    GC0015048Courtesy of CHRYSLER LLC
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.