2007 Chrysler 300 BaseFACTORY OEM SERVICE PROCEDURE

Generator - 3.5L

  1. Disconnect negative battery cable.
  2. Remove generator drive belt. Refer to ACCESSORY DRIVE .
    Fig 1: Upper Bracket
    GC0015636Courtesy of CHRYSLER LLC
  3. Remove bracket bolts.
  4. Remove upper mounting bolt.
  5. Raise and support vehicle.
  6. Remove middle splash pan.
    Fig 2: Battery Connection
    GC0015635Courtesy of CHRYSLER LLC
  7. Disconnect generator field circuit plug.
  8. Remove B+ terminal nut and wire.
    Fig 3: Generator
    GC0015634Courtesy of CHRYSLER LLC
  9. Remove lower mounting bolts.
    Fig 4: Removing/Installing Starter
    GC0015633Courtesy of CHRYSLER LLC
  10. Remove generator.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.