2006 Chrysler Sebring GTCFACTORY OEM SERVICE PROCEDURE

Air Injection: Pump: Installation

  1. Install air pump to vehicle. See Figure.
  2. Connect quick connect hose to inlet of air pump.
  3. Connect electrical connector. See Figure.
  4. Clip electrical connector to mounting bracket. See Figure.
  5. Install 3 mounting nuts and tighten. See Figure.
  6. Lower vehicle.
  7. Connect quick connect hose to the top of air pump.
  8. Install air inlet tube for the air cleaner box.
  9. Connect negative battery cable.
Chapter Navigation
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.