2006 Chrysler Sebring GTCFACTORY OEM SERVICE PROCEDURE

Resonator/Pipe Assembly: Installation

NOTE: Always work from the front to rear of exhaust system when aligning and tightening exhaust system components.
  1. Loosely install resonator/pipe assembly and muffler/pipe assembly.
  2. Install support isolators to muffler supports.
  3. Align resonator/pipe assembly and muffler/pipe assembly to maintain position and proper clearance with underbody parts. All support isolators should have equal load on them. Tighten resonator/pipe assembly band clamp to 54 N.m (40 ft. lbs.).
  4. Tighten muffler/pipe assembly band clamp to 54 N.m (40 ft. lbs.).
  5. Connect ground strap to muffler.
  6. Lower vehicle.
  7. Start the engine and inspect for exhaust leaks. Repair exhaust leaks as necessary.
  8. Check the exhaust system for contact with the body panels. Make the necessary adjustments, if needed.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.