2006 Chrysler Sebring GTCFACTORY OEM SERVICE PROCEDURE

Installation - 2.7L

  1. Install generator. See Figure.
  2. Install the 2 upper bolts but do not tighten.
  3. Install the engine dip stick tube.
  4. Connect the A/C pressure switch and A/C clutch electrical connectors.
  5. Connect the B+ terminal and field connectors. See Figure.
  6. Raise vehicle and support.
  7. Install the lower bolt and tighten.
  8. Install the accessory drive belt. Refer to COOLING .
  9. Install the accessory drive splash shield.
  10. Lower the vehicle.
  11. Tighten the 2 upper mounting bolts.
  12. Connect the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.