2006 Chrysler 300 Base, 42RLE/VLPFACTORY OEM SERVICE PROCEDURE

Engine & Automatic Transmission Cooling System: Engine: Fan-Radiator: Installation

Fig 1: Radiator Fan Assembly
GC0014710Courtesy of DAIMLERCHRYSLER CORP.
1 - RADIATOR FAN ASSEMBLY
2 - ELECTRICAL CONNECTOR
3 - UPPER RADIATOR HOSE
  1. Position radiator cooling fan assembly (1) in vehicle.
  2. Install cooling fan mounting bolts. Tighten to 6 N.m (50 in. lbs.)
  3. Connect cooling fan electrical connector (2).
  4. Install upper radiator hose (3).
  5. Fill cooling system (Refer to COOLING - STANDARD PROCEDURE)Β .
  6. Operate engine until it reaches normal operating temperature. Check cooling system and automatic transmission for correct fluid levels.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.