2005 Chrysler PT Cruiser Base, 2D Convertible, StandardFACTORY OEM SERVICE PROCEDURE

Fuel Injection: Specifications: Torque

TORQUE SPECIFICATIONS

DESCRIPTION  N.m  Ft. Lbs.  In. Lbs. 
Air Cleaner Lid Screws 3.9 - 35
Crankshaft Position Sensor Mounting Bolts 8 70
Engine Coolant Temperature Sensor 18 13.2 165
IAC Motor-To-Throttle Body Bolts 4.5 40
MAP Sensor 4.5 40
Oxygen Sensor 28 20
Powertrain Control Module (PCM) Mounting Screws 4 35
Throttle Body Mounting Bolts 11.75 +/-4 - 105 +/-20
Throttle Body Cable Bracket Bolts 11.75 +/-4 105 +/-20
Throttle Position Sensor Mounting Screws 6.2 55
Vehicle Speed Sensor Mounting Bolt 2.2 - 19.4
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • • You smell fuel, burning insulation, or see smoke.
  • • Brakes feel soft, pull hard to one side, or make grinding noises.
  • • The engine overheats, stalls repeatedly, or misfires under load.
  • • You are missing required tools, torque specs, or safe lifting equipment.
  • • You are not confident in the next step or safety outcome.