2005 Chrysler PT Cruiser Base, 2D Convertible, AutomaticFACTORY OEM SERVICE PROCEDURE

Installation - 1.6L

  1. Install coil and insulators. See Fig 1.
    Fig 1: RUBBER INSULATORS AND COIL
    GC0019925Courtesy of DAIMLERCHRYSLER CORP.
    1 - Rubber Insulators
    2 - Coil
  2. Tighten bolts to 12 N.m (105 +/-20 in. lbs.).
  3. Install gasket to upper intake manifold and. See Fig 2 and Fig 3.
    Fig 2: UPPER INTAKE GASKET
    GC0022908Courtesy of DAIMLERCHRYSLER CORP.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.