2005 Chrysler Crossfire Base, 2D ConvertibleFACTORY OEM SERVICE PROCEDURE

Installation - 3.2L

Fig 1: Locating Air Pump, Bracket & Retaining Bolt (3.2L)
GC0033621Courtesy of DAIMLERCHRYSLER CORP.
  1. Position the air pump (1) into the air pump retaining bracket (3).
  2. Install the air pump retaining bolt (2). Tighten bolt to 20 N.m (177 in. lbs.).
    Fig 2: Connecting Switchover Tube & Harness Connector (3.2L)
    GC0033622Courtesy of DAIMLERCHRYSLER CORP.
  3. Connect the air pump harness connector (2).
  4. Connect the air pump switchover tube (1).
  5. Install the air cleaner housing.
  6. Connect the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.