2005 Chrysler 300 BaseFACTORY OEM SERVICE PROCEDURE

Servo-Speed Control: Installation

WARNING: This page is about a different car, the 2005 Dodge Durango. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: SERVO CABLE CLIP REMOVE/INSTALL - TYPICAL
GC0009179Courtesy of DAIMLERCHRYSLER CORP.
  1. Position servo (2) to mounting bracket.
  2. Align hole in cable connector with hole in servo pin. Install cable-to-servo retaining clip (3).
  3. Insert servo mounting studs through holes in servo mounting bracket.
  4. Install two servo-to-mounting bracket nuts (1) and tighten. Refer to SPECIFICATIONSΒ .
    Fig 2: SPEED CONTROL SERVO LOCATION
    GC0010424Courtesy of DAIMLERCHRYSLER CORP.
  5. Position servo assembly (4) to correct mounting lugs on bottom of PDC (1) and install 3 screws. Tighten 3 screws. Refer to SPECIFICATIONSΒ .
  6. Connect vacuum line at servo.
  7. Connect electrical connector at servo.
  8. Connect servo cable to throttle body. Refer to INSTALLATIONΒ .
  9. Connect negative battery cable to battery.
  10. Before starting engine, operate accelerator pedal to check for any binding.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.