Safety Warning
DIY auto repair can cause serious injury, fire, or vehicle damage. These guides are for informational purposes only. Always follow OEM torque specs, wear PPE, and consult a certified mechanic if you are unsure. You are solely responsible for your safety.
Diagnostic Test
- 1) O2 SENSOR HEATER OPERATION
Turn the ignition off.
NOTE: Wait a minimum of 8 minutes to allow the O2 Sensor to cool down before continuing the test. Allow the O2 Sensor voltage to stabilize between 4.6 and 5.0 volts.Ignition on, engine not running.
With a scan tool, actuate the O2 Heater Test.
With a scan tool, monitor 2/2 O2 Sensor voltage for at least 2 minutes.
Does the voltage stay above 4.5 volts?
Yes
- Go To step 2).
No
- Refer to INTERMITTENT CONDITION .
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 2) O2 SENSOR HEATER ELEMENT
Turn the ignition off.
NOTE: Allow the O2 sensor to cool down to room temperature.Disconnect the O2 Sensor harness connector.
Measure the resistance of the 2/2 O2 Heater Element, between the O2 Heater Control terminal and the O2 Heater ground terminal in the O2 Sensor connector.
NOTE: O2 Heater Element resistance values should be measured at 70°F (21.1°C). The resistance value will vary with different temperature values.Is the resistance of the O2 Sensor Heater Element between 2.0 and 30.0 ohms?
Yes
- Go To step 3).
No
- Replace the O2 Sensor.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 3) (K399) O2 2/2 HEATER CONTROL CIRCUIT OPEN
Disconnect the PCM harness connectors.
CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.Measure the resistance of the (K399) O2 2/2 Heater Control circuit from the O2 harness connector to the appropriate terminal of special tool #8815.
Is the resistance below 0.5 of an ohm?
Yes
- Go To step 4).
No
- Repair the excessive resistance in the (K399) O2 2/2 Heater Control circuit.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 4) (Z902) O2 2/2 HEATER GROUND CIRCUIT OPEN
Measure the resistance between ground and the (Z902) O2 2/2 Heater ground circuit in the O2 Sensor harness connector.
Is the resistance below 0.5 of an ohm?
Yes
- Go To step 5).
No
- Repair the excessive resistance in the (Z902) O2 2/2 Heater ground circuit.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 5) PCM NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.
Were there any problems found?
Yes
- Repair as necessary.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
No
- Replace and program the Powertrain Control Module. Refer to MODULE-POWERTRAIN CONTROL .
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
Use the Manual With the Right Hardware
Pair factory procedures with proven DIY tools so the instructions are easier to execute.
Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.
When to See a Mechanic
Stop DIY work and contact a certified mechanic immediately if any of the following apply:
- • You smell fuel, burning insulation, or see smoke.
- • Brakes feel soft, pull hard to one side, or make grinding noises.
- • The engine overheats, stalls repeatedly, or misfires under load.
- • You are missing required tools, torque specs, or safe lifting equipment.
- • You are not confident in the next step or safety outcome.
