2003 Chrysler Voyager Base, 2.4 BFACTORY OEM SERVICE PROCEDURE

Installation - 3.3/3.8L

  1. Install coil over studs on bracket.
  2. Install 2 bolts to ignition coil.
  3. Install 2 nuts to the ignition coil studs. Tighten nuts and bolts.
  4. Connect the electrical connector to the ignition coil.
  5. Install the ignition cables to the ignition coil.
  6. Reposition the Power steering reservoir. Slide bracket over the mounting stud (Figure ).
  7. Install 2 bolts to the Power steering reservoir to intake manifold.
  8. Tighten the lower nut to stud on ignition coil bracket.
  9. Install the throttle and speed control cables to clip.
  10. Connect the negative battery cable.
Factory Service Tools

Use the Manual With the Right Hardware

Pair factory procedures with proven DIY tools so the instructions are easier to execute.

Disclosure: Verified tool recommendations may earn an affiliate commission at no cost to you.

When to See a Mechanic

Stop DIY work and contact a certified mechanic immediately if any of the following apply:

  • β€’ You smell fuel, burning insulation, or see smoke.
  • β€’ Brakes feel soft, pull hard to one side, or make grinding noises.
  • β€’ The engine overheats, stalls repeatedly, or misfires under load.
  • β€’ You are missing required tools, torque specs, or safe lifting equipment.
  • β€’ You are not confident in the next step or safety outcome.